KINGARC · Built to LastBrand-Owner Quality1 pc/SKU Trial OrderPrivate Label AvailableBatch Records on Request
Factory

Factory & Quality Control

How a batch actually moves: incoming material, in-process checks, final inspection, the batch record, and what is photographed before a container is sealed.

Factory & Quality Control
  • Fitment confirmed in writing before every quotation.
  • 100% factory QC on core mechanical and ignition components.
  • Batch test reports available for hardness, sealing, tensile and salt-spray performance.
  • In-stock dispatch within 24 hours after payment confirmation.
  • Trial orders from 1 pc per SKU.
  • Written warranty and claim policy available before order.
DocumentsBatch inspection records and test reports for hardness, sealing, tensile and salt-spray performance are available on request — ask for a blank sample sheet before you order.
Inspection and capability
ItemBasis
Factory QC100% on core mechanical and ignition components
Dimensional checkAgainst drawing, recorded per batch
Batch reportsHardness, sealing, tensile, salt-spray
TraceabilityBatch record travels with the shipment
Loading recordPallet layout and closed container, with seal number
Inspection by buyerWelcomed by arrangement before loading
Process

Five checks before a carton is sealed

Inspection stages
StageWhat is checked
01Incoming material
Material and hardness certificates checked against the reference before a batch is released to the line.
02In-process
Dimensions checked against the drawing at set points; thread accuracy verified with go / no-go gauges on ignition components.
03Final inspection
Core mechanical and ignition components are inspected 100% — insulator integrity, gap, resistance, sealing.
04Batch record
The record for that batch is filed and travels with the shipment.
05Packing & loading
Pallet layout photographed, closed container photographed with the seal number before departure.
On the floor

Packing, counting and container loading

KINGARC, Built to LastCartons labelled and stacked on the packing floorStable quality · Custom available · Commitment kept
Cartons labelled and stacked on the packing floor
Cartons stacked by reference before the packing list is closed
Cartons stacked by reference before the packing list is closed
KINGARC, Built to Last40 ft container loaded, pallets and crates checked before the doors closeStable quality · Custom available · Commitment kept
40 ft container loaded, pallets and crates checked before the doors close
Carton specification panel checked against the packing list
Carton specification panel checked against the packing list
Packing floor, actual footageCartons labelled by reference, counted against the packing list and stacked for the container. The same footage is what we send on WhatsApp when a buyer asks how their order was packed.
Company

More about KINGARC

Send the reference list. We quote line by line.

One inquiry is enough. We read the list, check the references and reply with availability, MOQ and lead time.

Get a Quote WhatsApp